February 11, 2007

Slow Progress.

Earl and I continued our work in the basement today. We are now getting his space ready so he can move his office down into the cellar. Then we won’t have to rely on instant messenger to communicate, as he’s currently upstairs in one of the spare bedrooms and I’m in the basement.

Such a technolife we lead.

No home improvement project is complete without a visit to Home Depot or Lowe’s so today we chose the former. When all is said and done I think I’ll be ready to wire the electric service for an entire house, as we were able to install two new receptacles, complete with surface wire molding and tie it into the house current in less than 30 minutes. They say opposites attract, and that must be true, because Earl and I have completely opposite ways of approaching a project, but after almost eleven years of doing this, we have a system that works for both of us.

One of the changes that came about was the relocation of my favorite clock from my school clock collection.

lurasharp.jpg

This clock is from my elementary school. Back in 2000 the school district replaced all the clocks by popping out the face, glass and hands and bolting a new clock on top of the wood casing. This clock had been removed for a remodeling project and wasn’t reinstalled, so they offered it to me when they found out I was a collector of these clocks. From what I’ve been able to find out, the clocks in my elementary school were custom designed for that school (there’s no documentation anywhere and this particular style clock hasn’t been found anywhere else to my knowledge) so this could be the last clock left completely intact. It’s rather loud when it advances, so those that sleep in the spare bedroom will be glad that it’s been moved to a new location.

We are traveling to the Big Apple next weekend, so the home improvement project will have to be on hold until after the flooring for the locker room/office arrives.